House Demolition
Full demolition of single and double-storey houses — approvals checked, services disconnected, structure down, block handed back level.
Learn more →A cleared block is not just an empty one. It is level enough to peg, free of anything that will cause trouble with footings, and still has every tree the council said must stay.
Licence and insurance details are provided on your discovery call, or whenever you ask. Request them →
Site clearing sits between demolition and construction. Sometimes it follows a house demolition. Sometimes the block has no house at all — a vacant lot, a subdivided rear block, an old market garden in the outer west, or a site that has sat untouched for years.
Typical scope:
Sydney councils each have their own tree controls, often under a development control plan, with permits needed above set sizes or for particular species. Some trees are protected outright. Heritage and biodiversity overlays add further layers, particularly in the Hills District, Hornsby, the Northern Beaches and the Sutherland Shire.
So no tree is priced for removal until the approval position is known. Retained trees get protection fencing around their root zone, and machines stay out of it.
Older Sydney blocks, particularly former industrial or agricultural land in the west and south-west, sometimes carry fill of unknown origin. It matters because:
Where fill looks suspect, it is tested before it is moved rather than after.
Clearing exposes soil. Approvals typically require silt fencing, a stabilised entry point for trucks, and keeping mud off the road. Sydney storms turn an unprotected block into a creek of sediment in minutes.
Growth areas around Penrith, Blacktown, Liverpool and Campbelltown include larger and rural-residential blocks where clearing is a bigger job — more vegetation, more fill, and sometimes old farm structures and dams.
Clearing is priced on volume, vegetation, disposal classification and access. See the 2026 cost bands.
Call 02 5943 7968 or send the job details through.
Full demolition of single and double-storey houses — approvals checked, services disconnected, structure down, block handed back level.
Learn more →The demolition half of a knock-down-rebuild, sequenced to your builder's start date rather than to ours.
Learn more →Rear extensions, second storeys, walls and wings taken off while the rest of the house stays standing and weathertight.
Learn more →Detached garages, carports, sheds, granny-flat shells and outbuildings removed, slab in or out.
Learn more →Driveways, slabs, paths and footings broken out and carted, reinforced or not, with the kerb and neighbours protected.
Learn more →How asbestos is found and dealt with before a Sydney demolition. Removal is carried out by a separately licensed asbestos removalist — referred, never done in-house.
Learn more →Not freely. Sydney councils regulate tree removal and the thresholds differ between LGAs. Many trees need a permit or approval, some must be retained and protected, and removing one without approval can bring significant fines. Tree removal is only included once the approval position is confirmed.
Fill is material dumped or spread on a block in the past — soil, rubble, sometimes rubbish. If it is not compacted or its contents are unknown, engineers often will not put footings on it. It may need to be removed or tested, and on older Sydney sites it can contain asbestos fragments.
A standard suburban block with a few outbuildings and vegetation typically takes one to three days on site. Large blocks, heavy fill, contaminated material or limited access take longer.
Sediment and erosion controls are a standard condition of most demolition and construction approvals in Sydney — silt fencing, stabilised site access and keeping soil off the road. Even without a formal condition, washing soil into council stormwater can breach environmental rules.